With enrollment continuing to surge across the district and school buildings projected to exceed capacity as soon as the 2027–28 school year, the Wayzata School Board voted 6–1 on November 10 to advance long-range facilities planning toward a potential 2026 bond referendum, with Valentina Eyres casting the lone dissenting vote.
The discussion marked the culmination of more than a year of study by district leadership, architects from Wold, construction partners from Kraus-Anderson, and a 20-member Community Task Force representing a cross-section of parent, advisory, and civic groups.
Capacity Pressures Mount Across All Grade Levels
District administrators presented updated enrollment projections showing steady growth at every level.
According to district data, Wayzata Public Schools’ 2025–26 total capacity is 13,029, and projections show enrollment climbing above 14,000 students by 2029–30.
Even using a conservative planning model:
- Elementary schools exceed the 90% utilization threshold beginning in 2027–28
- Middle schools exceed recommended 87.5% capacity during the same window
- Wayzata High School—already one of Minnesota’s largest—continues to grow toward 4,900 students
District leadership stressed that capacity standards are not simply enrollment numbers; each building must operate with some available space for programming changes, special education, and academic interventions.
Over the past decade, the district has added North Woods Elementary, expanded Meadow Ridge, built the Early Learning School, and purchased or repurposed multiple administrative facilities. But continued population growth across Plymouth and Medina is driving new pressure.
Advertisement:
Task Force Recommends a Multi-Site Expansion Strategy
The Community Task Force met four times in September and October to study enrollment, walk through building capacities, and examine possible options. Members represented district advisory councils, early learning, special education, Indigenous community members, and finance groups.
Their recommendation, presented to the Board, includes:
- Elementary additions to increase total K–5 capacity
- Reducing enrollment at Central Middle School and shifting boundaries or adding space to bring it closer to a recommended 1,200-student max
- Expanding Wayzata High School to meet 9–12 growth while maintaining program breadth
- Districtwide safety and security upgrades, including video systems, visitor verification, access control, and modern classroom lockdown capabilities
- Additional cafeteria, media center, or circulation improvements where older buildings face space constraints
- Phased construction to avoid excessive disruption and ensure operational continuity
Administrators emphasized that facility needs span both classroom space and security modernization. District leaders noted that hardware, software, and emergency communication systems reach end-of-life on a predictable cycle and must be upgraded to meet current standards.
Safety & Security: A Core Component of Any Referendum
A significant portion of the workshop focused on site safety, including:
- Upgraded video intercom systems for secure main entrances
- Districtwide electronic access control for staff
- Improved visitor management systems
- Expansive interior and exterior camera coverage
- Inside-locking classroom doors and instant lockdown buttons
- Unified emergency communication and mass-notification tools
The district framed these measures as a “future-focused physical security framework,” consistent across all 19 buildings.
Timeline: Board Must Act Quickly
For the district to place a referendum on the ballot in 2026, it must meet state review deadlines.
Key dates:
- November 25, 2025 — Deadline to submit Review & Comment to MDE
- January 2026 — Deadline for the Board to certify ballot language
- February–April 2026 — Community meetings and public information sessions
- Spring 2026 — Possible referendum vote
If approved, construction would occur in phases from 2027–2029.
What Happens Next
The School Board is expected to revisit the recommendation at its next regular meeting, where it may vote to authorize the Review & Comment submission.
If approved, the district will begin drafting detailed cost estimates, bond scenarios, and project phasing plans for public review.
Wayzata.com will continue to cover the process as the district refines both the scope and the question(s) that may ultimately appear on the 2026 ballot.

